Users / Clients Services Traffic Technical Services Funding and Staffing Basic Information
  1. In this section, please provide information about the entire network that is managed by your organisation, excluding links outside your national territory.
  2. 6
  3. 1
  4. 1
  5. 1
  6.  
  7.  
  8. 0.00
  9. All institutions are connected at 100 Mbps
  10. Please list each link separately, in the following order:

    • Direct to GÉANT
    • Indirectly to GÉANT via the SEEREN or EUMEDCONNECT project or another NREN (please specify each connection - adding as many lines as needed)
    • Direct to NORDUnet
    • Direct to other research locations (e.g. other NRENs, CERN, Starlight, Abilene (please specify each connection - adding as many lines as needed)
    • Direct connections to the Commercial Internet excluding Internet Exchanges (please specify each connection - adding as many lines as needed)
    • Peerings, connections to Internet Exchanges (please specify each peering - adding as many lines as needed)
    • Other – Please specify type
    To which network Usable capacity in Mbit/s  
    RedCLARA 18.000
       
  11. Initiative / Development Expected timeframe (years) Confidence  
    Expect to increase our BW to CLARA up to 34 Mbps 2 quite certain
    Currently only campuses in the capital city are connected. We are expecting to initiate the process of extension into the rural areas 1 quite certain
       
  12.  
  13. (x)Yes ( )No
  14. 2008
  15.  
  16. 5
  17. ( )Yes (x)No
  18. No
  19. Lack of knowhow by the partners
  20. National point-to-point IP links in use as at January 2009
    End points (cities) Usage (Testing, Production, Project, Backup) Total Capacity (Mbps) Data entered service
           
    International NREN to European destination point-to-point IP links
    End points (cities) Usage (Testing, Production, Project, Backup) Total Capacity (Mbps) Data entered service
           
    International NREN to non-European destination point-to-point IP links
    End points (cities) Usage (Testing, Production, Project, Backup) Total Capacity (Mbps) Data entered service
           
  21. CBF links in use as at January 2009
    End points Usage (Testing, Production, Project, Backup) Number of lambdas Capacity of each lambda (Gb/s) Data entered service
             
    Planned CBF links
    End points Usage (Testing, Production, Project, Backup) Number of lambdas Capacity of each lambda (Gb/s) Planned date
             
  22. Percentages should be of distance installed and used dark fibre % of the NREN backbone that is dark fibre % of this fibre that is on long term lease/IRU % of this dark fibre that is owned by NREN
    Present situation 0.0    
    Expected situation, early 2011 50.0 50.0  
  23. Wireless services Usage
    WLAN
    Fixed Wireless Access
    3G/use of mobile operators
    Wimax
    Satellite
    Other
  24. To ascertain level of eduroam deployment, we will use official eduroam database as a source of information. In order that the compendium reflects an accurate picture of the deployment in your country, please ensure that the entries from your NREN in the database are up-to-date.